TRAISIM
The objective of this project is to build a power system training Digital Twin that could be used to train future operators.
This training Digital Twin will be partly developed by the European project TWINEU (Pilot 8, covered by Task 5.5 – A power system training simulator for complex and critical situations) and be enhanced by this side project called TRAISIM.
TRAISIM focuses on the acceleration of the real-time simulator embedded in the training simulator, where the simulation must operate at least as fast as the actual physical processes it replicates.

Optgrid
Optimisation of the grid configuration (topology) for the power grid operation to ensure an acceptable level of electricity supply reliability.

Restoration
Restoration aims at exploring the advantages and disadvantages of power-electronics interfaced components during network restoration procedures, and to outline recommendations for BESS-based restoration plans.

COLib
COLib (https://colib.net) is the library of opensource, verified energy network component models and test cases

WOLF-I
WOLF-I stands for Wide-area Oscillations of Low Frequency with presence of IBRs (Inverter-Based Resources). Wide-area oscillations is a complex phenomena on power systems, all the more difficult to model and simulate that power electronics devices are now involved. On the other hand, the technology may bring in new opportunities.
CoRFu
CoRFu stands for “Control Room of the Future”. It is a doctoral network (“DoNet”) about energy system operation tools.
PSy
PSy is a doctoral network (“DoNet”) about power system stability, joining BiGER, Harmony, LaRISA, COLib, Restoration a.o.

TwinEU
TwinEU is the digital twin of the European power system. The project is sponsored by the Horizon Europe program under grant agreement n° 101136119.

DiSST
DiSST expands the SOGNO platform to help distribution companies meet their 3D goals (digitalisation, decarbonation, decentralisation).